download mega-arrow-down facebook twitter linkedin youtube Staalbouwsysteem Turnkey internationaal

Kilinto

Addis Ababa

Phase 1 – 21,366 m2 in size – was completed in 2013/2014. Phase 2 – 20,407 m2 in size – was completed in 2015/2016. The assignment was awarded to Remco Ruimtebouw because we were able to both supply the materials and assemble the building. The building was handed over in a wind and watertight state. RHDHV took care of the design and building management.

Further information

Would you like to know what Remco Ruimtebouw can do for you? Then please call us on +31 (0) 88 004 93 00 or email info@remco.jajo.com.

+Share

A group company of Janssen de Jong